Completion Design & Technologies
Wednesday, 10 March
Jaeren Room
Technical Session
-
0830-0850 237070Managing Risks Related To Surge, Swab And Production Packer Limits During Completion String Installation From A Semi-submersible Rig
-
0850-0910 237251Engineering And Execution Of The World’s Longest Lower Completion In An Ultra Extended-reach Offshore Well
-
0910-0930 237052A Multiscale Methodology For Predicting Peak Erosional Velocities In Stand-alone Sand Screens
-
0930-0950 23701810,000-Meter Ultra-Deep Well Completion Technologies
-
Alternate 237248Optimizing Late-life Well Completion Design In A Mature North Sea Field Through Tubing Design Analysis And Integrated Improvement Strategies
-
Alternate 237030Enhancing Production In Chalk Fields, Offshore Norway: Integrating Multi-lateral Technology And Acid Stimulation In Subsea Environments
-
Alternate 237104Operational Challenges, Learnings And Case Histories Deploying Smart Limited Entry Liner(LEL) Lower Completions In Mature Cretaceous(Barremian-Aptian) Carbonate Reservoirs
-
Alternate 237230Lessons Learned From Deep-set Barrier Deployment And Activation In Deepwater Completion Operations - A Bacalhau Case Study
-
Alternate 237012Experimental Study Of Sand Agglomeration Chemical Performance Under Varying Sand Characteristics Based On Field T
SPE/IADC International Drilling Conference and Exhibition

