11 Extended Reach Drilling
Wednesday, 8 March
Lysefjorden A
Technical Session
Extended reach drilling often encounters unique challenges during the well construction process. In this section, case studies are presented that provide the industry with specific guidance with respect to optimising extended reach well construction and pushing boundaries.
Session Chairperson(s)
-
0900-0930 212454Rock Mechanics Analysis of Observed Borehole Instabilities in an Ekofisk Field Extended-reach Well
-
0930-1000 212482Successful Field Implementation on an Integrity-focused Digital Monitoring System for Tubular Running in a Challenging Thermal ERD Application
-
1000-1030 212531A Water-base Drilling Fluid for Controlling Deep-reservoir Extreme Conditions in an Abu Dhabi Gas Shale Play