8 Completions and Well Intervention
Tuesday, 7 March
Lysefjorden A
Technical Session
The selection and installation of the completion in a new well is fundamental in the determination of the productivity and ultimate value of the asset. Intervention operations will determine the cost and value of operating and abandoning the asset. This session will focus on the integrity and durability of the assets. We will see how through-tubing technologies can be used in abandonment operations and how the durability of well heads can be improved through new designs which will reduce fatigue. Also, we will discuss how newly developed sand-screens can improve durability and integrity of the gravel pack and the well.
-
1600-1630 212530Safe, Robust and Efficient Through Tubing Abandonment
-
1630-1700 212462Development of Guidepost Based Wellhead Load Relief System (GP-WLR)
-
1700-1730 212570Gas Tight Mechanical Casing Annulus Packer Enables Compliance With Well Design and Barrier Requirements for Re-entry Multi-lateral Application in 20+ Year Old Well on Norwegian Continental Shelf
-
1730-1800 212548System Integration Test (SIT) of Technology Enabling Through-tubing Rig-less Plug and Abandonment
-
Alternate 212553Evaluation of Stress Distribution in Subsea Wellheads Installed in Caisson
-
Alternate 212541A Short Summary of Retrofit Multilateral Technology Implementation