6 Managed Pressure Operations - Experimental and Case Studies
Tuesday, 7 March
Lysefjorden B
Technical Session
Managed Pressure Operations are a key enabler for drilling operations with a challenging drilling window. In this session we will explore some of the latest applications of MPD, in both field operations and research and development. Successful applications in the field, proven through case studies, stimulate confidence in the industry to apply MPD to resolve current challenges. Meanwhile, the research showcased targets applying MPD techniques to new challenges. Attendees will have an opportunity to learn best practices to apply on their respective projects.
Session Chairperson(s)
-
1345-1415 212477Gas Bullheading Study in an Instrumented Well
-
1415-1445 212455Design and Calculation of Process Parameters in Bullheading and Pressurized Mud Cap Drilling
-
1445-1515 212514Successful Deployment of Managed Pressure Cementing (MPC) System Across a Challenging Narrow Pressure Window Condition for a Critical Liner Cement Job: A Case Study From Saudi Arabia
-
Alternate 212490The Amalgamation of Biosteering and Productivity Index Trend Analysis on the First UBCTD Well in Abu Dhabi
-
Alternate 212466Gas Migration Model for Non-Newtonian Fluids Under Shut-in Well Conditions
-
Alternate 212511Casing Design Implications of Managed Pressure Drilling and Cementing, and How to Consider Them in the Design of the Well and Operations