Pressure 2
Wednesday, 6 March
Grand Ballroom C
Technical
Well construction in very narrow pressure margin presented utilization of different managed pressure drilling approaches both in deepwater and land operations. Several advanced techniques to better understand downhole drilling dynamics, gas migration rates forecast and dynamic riser gas handling together with recent MPD case study in The Permian Basin will be covered in this session.
Chairperson
-
1350-1415 217703Field Scale Tests & Modeling to Forecast Gas Migration Rates for Pressurized Mud Cap Drilling (PMCD) Applications
-
1415-1440 217706Dynamic Simulation of Riser Gas Handling with a Fixed-Choke Constant Outflow
-
1440-1505 217710Performance Drilling With Managed Pressure Drilling In The Permian Basin: A Case Study In The Wolfcamp Formation
-
1505-1530 217932Mud-gas Separator Analysis: A Comprehensive Review of Sizing and Design Criteria, and Industry Standards